A technical opportunity is not a financing pipeline Separate energy potential, identified sites, evidence-ready projects and signed financing. These quantities have different units and boundaries. The fictional funnel below is a counting exercise; it reports no ReEx deal, investor mandate or regional market result. 1. Write the boundary and unit of a headline estimate: geography, sector, period and whether it describes energy, capacity or money. Preserve the date of the original report; an old technical potential is not a current transaction forecast. 2. Create a site-level register with stable identifiers before counting projects. Avoid counting the same site once as a technical study and again as a commercial proposal. Record incomplete information rather than assuming a project exists. 3. Define each gate with a document: a screened baseline, owner authority, technical review, credible cash-flow assumptions and the relevant commercial constraints. Evidence received does not mean independently accepted. 4. Report each stage separately and show exclusions. Do not multiply an illustrative conversion rate by an unrelated regional opportunity number. Financial close requires its own evidence; it cannot be inferred from the number of presentations sent. Fictional initial register: 20 unique sites considered. Unit: sites, not MW, kWh or dollars. Screened: 12 meet the exercise’s initial scope; 8 are excluded with recorded reasons. 12/20 = 60% screened within this invented set. Evidence-ready for discussion: 5 of the 12 have the specified baseline and owner documents. 5/12 ≈ 41.7%; 5/20 = 25%. Neither ratio is an investment approval. Financing: 0 signed financing records supplied in the exercise. Do not label the 5 evidence-ready sites financed or forecast a close rate. Pipeline register: Site ID __; boundary/unit __; stage __; required document/version __; missing evidence __; reviewer __; exclusions __; actual financing evidence __. Fictional initial register: ____________________ Screened: ____________________ Evidence-ready for discussion: ____________________ Financing: ____________________ Pipeline register: ____________________ IEA’s regional outlook gives dated energy context, not validation of this fictional pipeline. Use project-specific engineering, legal and financial review before relying on a real case. IEA — Southeast Asia Energy Outlook 2026 — https://www.iea.org/reports/southeast-asia-energy-outlook-2026