Ask an engineer for evidence tied to one decision A folder labelled “technical” is not a usable evidence request. Identify the investment question, the document that could answer it and the limits of the conclusion. The fictional solar example below requests a review; it does not describe a financed project or an engineering certification. 1. Write the decision and the project boundary: for example, whether an early energy estimate is suitable for further independent assessment. Do not ask an engineer to approve a deal from a headline yield. 2. List the inputs with versions and gaps: site coordinates, layout, equipment assumptions, resource series, losses and grid constraints. Separate measured inputs from estimates. 3. Ask for a reproducible output, an uncertainty statement and unresolved issues. Assign each missing input to a person and date rather than replacing it with a favourable assumption. 4. Define the next gate. If the evidence is incomplete, keep the investment conclusion open; a request delivered or a report received is not a financing approval. Fictional request ER-01: Decision: can the preliminary annual generation estimate proceed to independent assessment? Project: one proposed ground-mounted solar site. Input register: Layout L2; equipment sheet E1; resource series R1. Grid export limit and permitted site boundary unresolved; identify their owners before relying on the estimate. Requested output: Annual/monthly generation model with loss assumptions, input provenance, sensitivity to unresolved constraints and a list of exclusions. Acceptance check: Open the model and match its site, layout and equipment versions to the request. Require an explanation when a missing input is assumed rather than verified. Blank request: Decision __; project boundary __; supplied files/versions __; missing evidence __; required output __; uncertainty __; reviewer __; next gate __. Fictional request ER-01: ____________________ Input register: ____________________ Requested output: ____________________ Acceptance check: ____________________ Blank request: ____________________ A conceptual request cannot establish technical feasibility, a power price, grid access or bankability. Use qualified project-specific review for those decisions. ReEx — project-finance due diligence — https://reexasia.com/guides/project-finance-due-diligence/ IRENA — project facilitation — https://www.irena.org/Energy-Transition/Project-Facilitation